Quality Control and Materials Handling Question
B.Sc
Mechanical Engineering
Part-3 Odd Semester Quiz Examination-2017
Course
Code: Math3133 Quality Control and Materials Handling
Full Marks: 7.5
Time:30 Minutes
Multiple choices Question
1) In Juran Model of optimum quality the
curve is described in
a) Two zones b) three
zones c) Four zones d) Five zones
2) Which the following one is not
non-conformance cost
a) Rework
b) Scrap c)Inspection d) Down time
3) The basic objectives of seven tools of
TQM are to answer to a series of question, commonly known as
a) 4W3H
b) 2W5H c) 6W1H d) 5W2H
4) From Pareto analysis, what do we
observe?
a) 80-20 rule
b) 80-30 rule c) 80-10 rule d) 70-30 rule
5) Cause-Effect Diagram is also known as
a) Ishikawa diagram b) fishbone diagram c) a & b d) None of them
6) The most commonly known and popularly used
statistical tools of production process and quality levels are
a) Shewhart control chart b) Hypothesis
testing c) Acceptance Sampling plan d) all the
above
7)
It is expected that the values of quality characteristics remain
randomly on both side of the…….
a) mean b) center line c) Upper control
limit d) a &b
8. Type-I error is
a) Producer’s
risk b) Consumer’s risk c) None of them d) Both of them
9. Which one is not control chart for
attributes?
a) p chart b)
r chart c) c chart d) u chart
10. The validation of ISO certificate is
a) three years
b) four years c) two years d) five years
11. Draw a OC curve.
12. Type-II error is
a) Producer’s risk b) Consumer’s risk c) None of them d) Both of them
13. Write down the equation of AOQ.
14. _____ is a statistical process, where
a specified number of units from a lot or batch is picked up for inspection.
a) Attributes
sampling b)Variable sampling c) Continuous Sampling d) Chain Sampling
15. Which one is control chart for
variables?
a) p chart b)
s chart c) c chart d) u chart
16. Control chart helps in controlling
the process, by analyzing whether it goes-
a) out-of-control b) in-control c) both d) None
17. Which one is not seven basic tools of
TQM?
a) Scatter diagram b) Histogram c) Quality circle d) Stratification analysis
18. ISO documentation system is completed
by
a) four
levels b) five levels c) three levels d) six level
20. Your college library is going to buy
some books in lots of size N=3000. College authorities decided to use a single
sampling plan with n=100 and c=2 for receiving inspection. Then
a) Draw the OC curve for this plan.
b) Draw the AOQ curve and find the AOQL.
Comments
Post a Comment